Plans to build a prototype fusion power plant in the United States have come into tighter focus, as a new report lays out a rough timeline for building the multibillon-dollar plant and a strategy for developing its design. The United States should strive to start construction of the pilot by 2035 and to have it running by 2040, according to a report released this week by the National Academies of Sciences, Engineering, and Medicine (NASEM). To meet that tight schedule, the report calls for the U.S. Department of Energy (DOE) to help fund two to four teams that, in collaboration with private industry, would develop by 2028 different conceptual designs.
To read more, click here.